Reagan - Code Sun 123 / Photo Taken 5/7/2020

Directions:  I-24 to Sam Ridley to right Old Nashville Hwy. to right on Rocky Fork Rd, (next to I-24 Nashville Campground) to right on Big Son Lane.  GPS:  Big Son Lane

Photos below are not of actual home. Photos are shown to give you an idea of what home will look like when finished.
Materials, items and colors will vary.

 

Property302 Prosperous Lane, Smyrna, TN 37167
Lot Number123
Community NameSundale
Floor Plan NameReagan
CountyRutherford
Price$298,900
Seller NameDennis Butler Builders, LLC
MLS Number (after cabinets installed)2144882

Main Floor:  1,544
Bonus Room:  457
Total Square Feet:  2,001

  • 3 Bedrooms
  • 2 Baths
  • Bonus Room
  • 2 Car Garage

Lot Size:  75 x 140
Earnest Money Required:  $1,000
Annual Taxes:  $2,444

INTERIOR

  • Ceiling Fan in Bonus Room
  • Ceiling Fan in Great Room
  • Ceiling Fan in Master
  • Electric Heat
  • Deadbolts on Front and Rear Door
  • Granite Kitchen Counters Included
  • Master Main Floor
  • No Fireplace

EXTERIOR

  • 2 Car Garage
  • 2 Garage Remotes
  • Concrete Drive, Walk & Steps
  • 2 Exterior Hose Bibs
  • Lawn Seeded & Strawed
  • City Water / Sewer
  • Construction: Stone / Vinyl
  • Fence:  No
  • Outbuilding:  No
  • Patio or Deck: Yes
  • Basement:  No

APPLIANCES

Color:  Stainless
Stove; Electric
Microwave
Dishwasher
Disposal
Refrigerator
Click Here to See Appliances

FLOORING

Carpet:  Hallway, Steps, Bdrms & Bonus
Hardwood: Great Room & Kitchen
Tile: Baths
Click Here for Flooring

How far along is the house? (Updated weekly.)

Building schedules are typically dictated by codes inspections, sub contractor availability and of course, the weather. For this reason, Realtors & Buyers are not given any building schedule. Realtors can only report what has already been completed.

Property taxes shown are a new construction estimate.  Purchaser to verify with lender and/or title company prior to sales agreement.

Submit lender pre-approval letter with offer. No home is take off the market without a lender pre-approval letter.

Room sizes may vary on jobsite! Rooms are measured after drywall is installed.  All measurements are rounded to the nearest whole.
Date Measured: 4/27/2020

Kitchen20 x 10
Dining RoomEat In
Great Room20 x 14
Master Bedroom13 x 15
Bedroom 210 x 11
Bedroom 310 x 11
Bedroom 4None
Bonus Room23 x 19
Garage2 Car

Video Shown of Similar Home. Colors and Fixtures May Vary.

Builder occasionally makes changes on cabinet layout. Check home prior to any agreement.

Measurements and square footage shown are APPROXIMATE.  Changes sometimes occur during construction.  Please see specific house for exact measurements and square footage.  When photos and/or renderings are shown of another home, they are shown for illustration purposes only.  Unless it is specifically stated in your agreement, an item may or may not be included or be built as shown.  If you have a specific concern, please address prior to contract agreement.  Seller reserves the right to change any fixtures, doors, windows, placement of walls, railings, front porch columns, cabinets, counter tops, etc, at any time during construction.

Verify all room sizes and square footage if a concern prior to agreement. All final square footage is determined at time of appraisal. Completion date shown is an estimate only, time could vary depending on weather, supply and subcontractor availability.  Tax amount shown is a new construction estimate.  Please consult with your title company for a more accurate amount.

All sales and marketing information is deemed reliable, but not guaranteed.  If any matters are of specific concern, it is up to the consumer to obtain independent advice or information.  Seller and/or agent will not be held liable.

All advertising will show a garage and/or placement for a driveway.  Trees, Codes, water and sewer lines, topo of the lot, and rock must all be considered. Builder determines the location of the driveway, and if any plan needs to be "flipped", to accommodate these items.  "Because you see the garage on the left or right on our website or drawings, does not necessarily mean the garage will be on that side when built."

Scroll to Top
I go out weekly to check the Stage of Construction UNLESS it is raining or sub-contractors are in the house working.